Our company undertakes multiple subcontracted projects of the CAP1400 demonstration project, all of which are independently designed and manufactured. As the first batch of subcontracted projects to start construction, the JE38/39 instrument has guiding significance for the implementation of subsequent projects. The company leaders personally deploy it. Nuclear industry instruments The business department takes the lead in implementation to ensure that all work is carried out in an orderly and smooth manner.
The participants confirmed the company’s capital raising status, submission status of start-up documents, deviation closure status, etc. After checking that the company’s quality assurance system is effective and the required documents are complete, the company is released to start construction.
After the meeting, Mr. Chen Yao, chairman of the company, accompanied the representatives to visit the production and test bases, and introduced the operation of the company’s various liquid level instruments and flow meter inspection and calibration laboratories.